top of page

Co-Operative, Dordon

The brand-new Co-Operative store in Dordon, Tamworth was taken from an empty shell to an attractive new shop with the help of NLT Electrical:

  • Install a 200amp fused isolator with 160mp fuses

  • Merlin 3-phase distribution boards

  • Distribution boards (32amp breaker) to power freezers, ovens, air con units, lighting and more

  • Install 8x fused connection units for outdoor sign lighting

  • Install 8x anti-vandal 1800 dome fittings on external walls

  • Install data points in the office, tills, and above the ceiling

  • 32amp 3-phase supplies for the ovens and freezers

  • Install occupancy sensors in the stock room, toilets and cleaners room

  • Install fire alarm spurs with keys

  • Install 2x fuse spurs for the roller shutter 

  • Install 2x DSO for the ATM on radials

  • Install 2x drop-down glass emergency lights

  • Install bulkhead light on the exterior

  • All containment, basket tray and uni strut for lighting to hang from

  • Test all circuits and emergency lighting
     

bottom of page